Municipal wastewater treatment plants for a connection value up to 10,000 PT.

Municipal wastewater treatment plants for a connection value up to 6,500 people.

Alongside our standard programme of wastewater treatment plants with a connection values of up to 6,500 people we offer you tailor-made solutions for small and medium-sized municipal applications. In this field we see ourselves as an independent product planning and implementation company  for wastewater treatment systems with a performance of up to 5,420 people. Our scope of services and delivery covers all steps from the process-technical concept up to complete technical dimensioning of all components of the wastewater treatment plant – from the inlet pump station over the mechanical preliminary treatment to the biological treatment stage up to the treatment of the excess sludge. The acquisition of all components and materials from our subcontractors, the in-house engineering and the production of the plant control system (where all our knowhow counts!), the detailed checking and preparation of all articles before delivery as well as a well-prepared documentation make our technology package complete.

There are no individual outlandish solutions. With you, we develop the optimum solution for the treatment of your wastewater.

After the treatment process has been determined our service personnel go over to the dimensioning and selecting of the appropriate units: The dimensioning of the pump station, selection of the appropriate pumps for raising the water from sewer system level to the wastewater treatment plant, selection of the mechanical screen, dimensioning of the SBR tank and the selection of the required aerators dependent on the biological load. All parts are so selected such that the optimum solution for the desired performance is delivered.

A whole series of planning tasks precede the construction of each a wastewater treatment plant. The better these preparations are carried out the more efficiently the plant be conceived, planned and realised. Therefore, with larger projects, from the beginning our PROFESSIONAL Team supports you with its comprehensive services and looks after you until well beyond the completion of the plant. Naturally, at the start of each new wastewater treatment plant there is always the question: "What precisely is to be constructed?“ However, before there is an answer there is a host of further questions that have to be answered first within the scope of determining the actual preliminary status.

A whole series of planning tasks precede each construction of a wastewater treatment plant. The better these preparations are carried out the more efficiently can the plant subsequently be conceived, planned and realised. Therefore, with larger projects, from the beginning our PROFESSIONAL Team supports you with its comprehensive services and looks after you until well beyond the completion of the plant. Naturally, at the start of each new wastewater treatment plant there is always the question: "What precisely is to be constructed?“ However, before there is an answer there is a host of further questions that have to be answered first within the scope of the determination of the actual status.

Site Visit

With an on-site inspection we determine the local conditions and clarify what matters: site of the plant, piping and cabling, peripheral devices to be added, possible existing tanks, requirements on the discharged water, and many other matters….

Conceptual approaches

After all relevant project specific information has been assessed, we produce offer various project concepts. This will enable us that to achieve the goals provided to us by you. Ultimately, “all roads lead to Rome…“.

Jointly reaching a solution

These creative, synergistic approaches lead to finding the optimum solution. Together with you, in one or more meetings, the different variables are discussed, the respective pros and cons weighed against each other and a cost-benefit analysis is undertaken. The result is the optimum concept for your wastewater treatment plant.

Convincing others

Often, others have input into the decision. In such cases our PROFESSIONAL Team will be present. We present the elaborated concept developed to the decision makers and convincingly explain in necessary detail why this is the optimal solution. This presentation will be adapted as needed for open council meetings, associations, authorities, company decision makers, and other stakeholders.

Ready to Start

Once this hurdle is over, things really begin to start with us: The final design of the plant is elaborated, planning and approval documents are produced, explanatory reports are written and possible texts for requests for proposals are prepared. If further components such as, for example, fat separators, screw screens or ordinary screens are required, we also take care of these and provide assistance with the selection of the optimum peripheral devices. This always includes your input. Two-way communication is a high priority with us, as a means of the continuous exchange of relevant information.

Production

While your wastewater treatment plant is in production at our manufacturing facility, the PROFESSIONAL Team also takes care of your project and is continuously monitoring the project and making sure all milestones and schedules are met.

Assembly and acceptance

Once your wastewater treatment plant is ready and has been put through the paces, assembly, and the test phase, acceptance of the plant will follow. At this stage our specialists from our PROFESSIONAL Team are ready to go.

All AQUAmax® PROFESSIONAL XXL are unique; each plant is designed according to individual requirements, needs and circumstances, each plant is planned with individual tank size and shape. The same individuality also naturally has a bearing on the intelligence of the plant: with the control centre. The classical AQUAmax® PROFESSIONAL XXL-control system regulates the plant completely automatically. This system can, as required be fitted with various additional functions. For example, the plants can remotely serve as control centers where heating can protect electronic components from the cold and moisture. In addition or a power failure monitoring can signal a hazardous power failure.